Mine Remediation in Ganzhou, Jiangxi — Multi-Stage Centrifugal Blower


In an environmental remediation project at a mining area in Ganzhou, Jiangxi Province, the existing auxiliary blowers suffered from insufficient static pressure and elevated energy consumption, compromising the efficiency of exhaust gas treatment and compliance with emission standards. Following multiple rounds of on-site operational assessments and comparative evaluations of products from various manufacturers, the client selected custom-designed multi-stage centrifugal blowers from Nantong Rongheng Environmental Protection.
Rongheng’s technical team, taking into account the mine site’s harsh operating conditions—high dust levels and heavy loads—has tailored its design to optimize the impeller structure and wear‑resistant components. Since commissioning, the equipment has delivered stable airflow and pressure while maintaining controllable noise levels; field measurements show that energy consumption is more than 15% lower than that of the previous fan model. The unit has operated smoothly since startup, with no major failures impacting performance, thereby significantly reducing maintenance and operational costs. Our partner has expressed strong satisfaction with both the equipment’s performance and the associated support services, and plans to continue collaborating on future projects.